PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Core Drilled holes at the Bathrooms through the building Facing West.jpg Core drilled holes for the sanitary piping at the 3rd floor Facing West.jpg Fireproofing the 4th floor Facing North.jpg Installing beams at Elev. 4 Facing South.jpg Started installing the metal framing around the perimeter of the roof Facing North-East.jpg Duct work at the 2nd floor Facing West.jpg Started painting the mockup at the Stairwell -2.jpg Installing duct work at the 2nd floor Facing North.jpg Installing duct work at the 2nd floor Facing West.jpg
Previous pageNext page Started installing the metal framing around the perimeter of the roof Facing North-East
Started installing the metal framing around the perimeter of the roof Facing North-East